TJ Wies Prefab proudly partnered on a distinctive and challenging project to deliver a prefabricated modular roof structure for the First Community Credit Union (FCCU) in Chesterfield Valley, Missouri. The mission was to bring the entrance of the existing office building up to FCCU’s brand standards—specifically, the installation of a barrel roof—without significantly disrupting daily operations. Prefabrication was selected as the ideal solution to limit construction impact during business hours while ensuring a high-quality, efficient installation.
Type: Financial Institution, commercial
Location: Chesterfield, MO
Dimensions: 26’L x 10’W x 6’T
Build Duration: 2 weeks (off-site)
Install Time: Less than 4 hours (on-site)
Fabrication Site: St. Peters, MO
To accommodate prefabrication, the updated architectural components were designed off-site using precise logistic planning. The team leveraged the existing hidden structural framework and original building documents to work around the constraint of not being able to demolish the existing structure until the day prior to installation.
The modular roof unit was fabricated entirely at the TJ Wies Prefab & Innovation Center in St. Peters, Missouri. Once complete, it was transported to the job site via tractor trailer and installed in a single, seamless operation. The structure came fully assembled with the following components:
No on-site assembly was required—just a one-and-done set by TJ Wies Contracting, Inc., which minimized on-site disruption and maximized safety.
Prefabrication drastically improved the construction schedule. By building off-site, FCCU was able to keep their main entry operational for 10+ additional days compared to traditional methods. Despite minor weather delays, both the off-site build and on-site installation were executed without any unforeseen issues.
While direct cost savings were not the primary goal, the value was delivered through:
These operational efficiencies provided substantial intangible value to the client.
Challenge: Designing around existing conditions that couldn’t be revealed until just before install.
Solution: Close coordination with First Community Credit Union and use of original construction documents allowed the team to model accurately and prepare for a precise fit.
This project is a clear example of the value of prefabrication in high-traffic, operational environments. By minimizing disruption, increasing safety, and accelerating delivery, the TJ Wies Prefab team was able to exceed client expectations.
Special thanks to all project partners who made this vision a reality:
Bill VanGels (FCCU)
Wright Construction Services
ACI-Boland Architects
KPF&F Engineering
Excel Engineering
Sto Corp
Radius Track
Negwer Materials
Kinder Crane